|
|||||||||||||||
|
T:
+ 44 (0) 1358 724361 |
|||||||||||||||
![]() |
|
||||||||||||||
|
|
In the case of shallow and/or low temperature wells an accelerator added to the slurry will do exactly as its name suggests to the thickening time / set time. When cementing surface pipe, economics dictate that excessive WOC time is undesirable, accelerators being used to allow drilling operations to go ahead as soon as possible.
|
|
|||||||||||||
| SITEMAP | Copyright © 2006 Aubin Ltd, all rights reserved | ||||||||||||||